News

Company news

How to customize the Pat Light

2025-10-24

Clarify Requirements

Functionality and Design Planning: Determine the basic parameters of the Paipai Light, such as size, shape, light source type, and brightness adjustment modes. Also, consider whether additional features are needed, such as wireless charging, music playback, and mosquito repellent aromatherapy. Also, clarify the appearance details, including the hardness of the silicone material, surface finish, and logo printing placement and process.

Budget and Delivery Time: Plan the order quantity, unit cost, and delivery time in advance. The minimum order quantity is typically around 500 pieces, with a sample production time of 3-5 days and a mass production time of 15-20 days.

Screen Manufacturer

Qualification and Experience Assessment: Prioritize manufacturers with ISO certification, RoHS environmental certification, and at least five years of production experience.

Communication and Service Comparison: Through on-site visits or video factory inspections, confirm whether the manufacturer offers one-stop design support, such as free renderings and 3D modeling services. Also, understand whether the manufacturer's cooperation model is flexible, whether it supports custom orders based on drawings and samples, and whether it has an intellectual property protection agreement. Proofing and Confirmation

Sample Production Process: Based on the required design drawings, the manufacturer creates a preliminary sample using hand-dipped glue or CNC engraving, focusing on verifying structural rationality, user experience, and process feasibility.

Contract Signing Key Points: After the sample is confirmed, the contract must clearly define quality standards, such as LED lifespan and silicone tear resistance. The payment ratio must also be determined, typically requiring a 30% deposit upfront, with the final payment due before shipment.

Mass Production and Quality Inspection

Standardized Production Process: After confirming the sample, the manufacturer begins mold development, using steel or aluminum to create durable molds to ensure batch consistency. Raw materials such as food-grade silicone are purchased, and automated production is carried out using equipment such as vulcanizing machines and vacuum degassing machines.

Multi-Level Quality Inspection System: During the production process, the manufacturer conducts random inspections, sampling 5% of each batch for functional testing. Final inspections include high-voltage insulation testing and drop testing.

Delivery and After-Sales Service

Logistics Tracking: The manufacturer typically prefers shipping by sea freight or direct delivery by dedicated truck, and provides a real-time tracking number. After-sales response: During the warranty period (usually 1 year), the manufacturer will replace defective products free of charge, support return to the factory for repair of complex faults, and provide production batch numbers and quality inspection reports to facilitate subsequent traceability and optimization.